How-to

How to Migrate from Canny to a Flat-Price Feedback Board

Leave Canny’s tracked-user model without losing posts, votes, or roadmap history. A step-by-step migration to a flat-price feedback board with checklist and cutover tips.

September 9, 20266 min read
How to Migrate from Canny to a Flat-Price Feedback Board

How do you migrate from Canny to a flat-price feedback board? Inventory posts, votes, comments, and roadmap statuses; export via Canny’s current CSV/API options (re-verify before you start); pick a destination that keeps voting + public roadmap + changelog without metering end users; import and remap statuses; dual-run briefly so you don’t double-count votes; then reconnect Slack/Linear and voter notifications. Feedjolt fits teams who want flat workspace pricing, auto-merge duplicates, and changelog-on-ship — validate on a short trial at https://www.feedjolt.com/en/register before you cut over.

This is a practical cutover playbook for SaaS teams who already decided Canny’s tracked-user pricing model no longer fits — not another alternatives listicle. For the wider shortlist, see Best Canny alternatives for flat pricing (2026) and the head-to-head Feedjolt vs Canny.

Why teams migrate from Canny to a flat-price board

Tracked-user bills vs workspace-flat predictability

Canny popularized the modern feedback board. The tension appears when success expands who can post, vote, or comment — the meter starts shaping product decisions (who sees the widget, where the portal lives). A flat workspace bill flips that incentive: listening more does not automatically cost more. Re-verify Canny’s live pricing and tracked-user definition the week you migrate; do not rely on a blog screenshot.

What you should keep (and what you can drop)

Keep the spine: public board + voting, a public roadmap customers understand, and a changelog that closes the loop with voters. Drop the rest if it is not load-bearing — you do not need a full support suite just to escape a meter. See flat-price feedback boards and public roadmap tools for SaaS for the product criteria.

Pre-migration inventory

Posts, votes, comments, attachments, voter emails

  • Export or screenshot your top 20 posts by votes — those are the cutover QA set
  • Capture vote totals and voter emails where available (power users notice missing votes)
  • Note comments that encode scope (“SSO” vs “SCIM”) so you do not merge them away later
  • List attachments you still need; many migrations lose files

Roadmap columns and custom statuses

Write a status map before import: Under review → Planned → In progress → Complete (or your equivalents). Customers trained on Canny statuses will treat a silent remap as a broken promise. Publish the map in your first changelog entry after cutover.

Integrations still in use

Inventory Slack channels, Linear links, portal widgets, SSO, and any custom webhooks. Anything load-bearing must be re-proven on the destination before you move DNS or the embed.

Export options from Canny (re-verify before publish)

Native export / CSV paths

Canny’s help docs document export paths that change over time. As of this writing, treat CSV export of posts/voters as the baseline path — re-check Canny’s current help center the morning you start. Do not invent a one-click “Canny importer” on either side unless the product UI actually shows it.

API pull for power users

If you have API access, pull posts, comments, and vote metadata into a staging sheet. Keep a frozen snapshot dated with the export. That freeze is what you QA against after import.

What usually does not transfer cleanly

  • Widget styling and custom CSS
  • Historical email notification preferences
  • Some attachment binaries
  • Tribal meaning of statuses (document the map)
  • SSO / admin roles until you reconnect them

Choosing a flat-price destination

Must-haves checklist

  1. Public voting board that can hold your post volume
  2. Public roadmap that updates when status changes
  3. Changelog / voter notify on ship
  4. Import path (CSV, public board URL, or API) you can QA
  5. Pricing model that does not meter end users as they grow
  6. Slack / Linear (or your stack) with a documented reconnect path

When Feedjolt fits

Feedjolt is a flat-workspace feedback board with unlimited boards, posts, contributors, and voters as marketed on the homepage, plus auto-merge duplicates, changelog-on-ship, Slack/Linear on the premium set, and MCP for HITL triage in Claude/Cursor. Import is CSV or public board URL — not a magical one-click Canny button. Soft-check the live plan matrix before you apply; premium integrations sit on Startup (by application) and Scale, not Growth.

When a suite or self-host is the better call

Pick Featurebase-class suites when CS owns the tool and needs inbox + help center unified. Pick Frill/Nolt-class lite boards when you want something simpler and are fine without MCP. Self-host when data residency and control beat shipping speed. Be honest: if a specific Canny integration is load-bearing and the destination lacks it, dual-run until coverage exists.

Import + remap playbook

Create board + branded portal

Spin the destination workspace first. Match branding, board names, and roadmap columns to the status map. Keep the portal private or soft-launched until vote totals pass QA.

Import posts and preserve vote counts (honest limits)

Import the CSV or public board URL. Spot-check the top 20 posts: title, vote total, and at least one comment. Prefer email-matched voters when the importer supports it. Treat any gap as a blocker — do not cut over hoping nobody notices.

Remap statuses and public roadmap

Apply the status map. Publish a staging roadmap and walk it with one PM and one CS lead. Link related reading: changelog that closes the loop with voters and how to choose a feedback board.

Cutover weekend — dual-run without double votes

  1. Freeze new posts on Canny Friday evening (or announce a short intake pause)
  2. Final delta export → re-import deltas only
  3. Point the widget / portal URL to the new board Saturday
  4. Leave Canny read-only for 7–14 days as a rollback mirror
  5. Do not collect votes in both places — that double-counts demand

Reconnect Slack, Linear, and voter notify

Reconnect Slack channel mappings and Linear two-way sync on a plan that includes them. Promote one staging request end-to-end: board → Linear → ship → voter email → changelog. If that path fails, you are not ready for production traffic.

14-day post-migration checklist

  1. Day 1–2: QA top 20 posts; fix vote gaps
  2. Day 3: Announce the new portal + status map in a changelog
  3. Day 4–5: Reconnect Slack/Linear; run one closed-loop ship
  4. Day 7: Review duplicate rate and merge policy
  5. Day 10: Optional MCP triage dry-run (HITL only)
  6. Day 14: Turn off Canny if rollback is no longer needed

FAQ

Will I lose votes if I migrate?

Only if you skip QA. Import, then validate totals on popular posts before cutover.

Does Feedjolt offer a one-click Canny importer?

Do not claim that. Use CSV or public board URL import and treat migration as a QA project.

How long should dual-run last?

Usually 7–14 days read-only on the old board. Collect votes in only one place.

When should I stay on Canny?

When the meter is affordable, integrations are load-bearing, and change management cost exceeds the pricing pain. See Feedjolt vs Canny.

Start the flat-price cutover on a trial

Import a copy, remap statuses, and prove one Slack → Linear → ship loop before you move the widget. Start the 14-day Feedjolt trial — no card, cancel in one click.